- Home
- Quality
Production Process
![CNC machining 1](https://ruidapacking.com/wp-content/uploads/2022/08/CNC-machining-2.jpg)
CNC machining 1
![CNC machining 2](https://ruidapacking.com/wp-content/uploads/2022/08/CNC-machining2.jpg)
CNC machining 2
![Parts inspection](https://ruidapacking.com/wp-content/uploads/2022/08/parts-inspection.jpg)
Parts inspection
![Assembly of capsule filling machine](https://ruidapacking.com/wp-content/uploads/2022/08/assembly-of-capsule-filling-machine.jpg)
Assembly of capsule filling machine
![Assembly of tablet press machine](https://ruidapacking.com/wp-content/uploads/2022/08/Assembly-of-tablet-press-machine.jpg)
Assembly of tablet press machine
![Assembly of tablet counting machine](https://ruidapacking.com/wp-content/uploads/2022/08/Assembly-of-tablet-counting-machine.jpg)
Assembly of tablet counting machine
![Tech inspection](https://ruidapacking.com/wp-content/uploads/2022/08/Tech-inspection.jpg)
Tech inspection
![Quality inspection](https://ruidapacking.com/wp-content/uploads/2022/08/Quality-inspection.jpg)
Quality inspection
![Delivery](https://ruidapacking.com/wp-content/uploads/2022/08/Delivery.jpg)
Delivery
Detailed Inspection Through Every Sections Of Our Process
![Raw material Test](https://ruidapacking.com/wp-content/uploads/2022/08/噪音检测图.jpg)
Raw material Test
Test the carbon ratio of steel sheets and see whether it meet the medical and food grade.
![Part / Mold Tolerance](https://ruidapacking.com/wp-content/uploads/2022/07/检查零件模具公差.jpg)
Part / Mold Tolerance
Whether the precision meets the design requirements.
![Pressure Test](https://ruidapacking.com/wp-content/uploads/2022/08/压力测试.jpg)
Pressure Test
Test the actual pressure level of the equipment.
![Fatigue Test](https://ruidapacking.com/wp-content/uploads/2022/08/疲劳测试.jpg)
Fatigue Test
Continuous 72 hours of power-on operation to test the machine durability.
![Noise Test](https://ruidapacking.com/wp-content/uploads/2022/08/噪音测试.jpg)
Noise Test
Noise tester less than 75 dba meets the international requirements which reduces the harm to hearing.
![Material Moisture Test](https://ruidapacking.com/wp-content/uploads/2022/07/水分检测图.jpg)
Material Moisture Test
Test the available moisture range of the material to adjust the machine.
![Tablet Condition Test](https://ruidapacking.com/wp-content/uploads/2022/07/硬度检测.webp)
Tablet Condition Test
Test the hardness and dissolution of tablets to meet your formula.
![Machine Balance Test](https://ruidapacking.com/wp-content/uploads/2022/07/使用水平仪测试设备的平衡水平.jpg)
Machine Balance Test
Test the balance of the equipment to prevent shaking while in operation.
![Standardized Management Following 6S Guideline](https://ruidapacking.com/wp-content/uploads/2022/07/整洁明亮干净成品设备的车间.jpg)
Standardized Management Following 6S Guideline
Sorts: Clear out parts and tools that are not in use.
Set in order: Arrange all items used on a daily basis for easily access
Shine: Clean the workshop and make sure every section works properly.
Standardize: Develop a discpline for sort, set and shine
Sustain: Keep and follow the procedures
Safety: Identify abd eliminate all the potential hazards in workshop
Products Certificates
![](https://ruidapacking.com/wp-content/plugins/ruida-plugins/images/contact_detail_icon.png)